REBID - Kennedy HS Administration Relocation, Project #1000004435R

The Project consists of relocating the existing panels and equipment for the Fire Alarm System, Clock/Speaker System, Security Alarm System, and Telephone System from existing MDF Room to new MDF Room in Bldg. 300. All of these systems will need cabling connections restored or provided between the new MDF and the IDFs located in other buildings on the campus including the portable buildings. The scope of work also includes framing a new wall and door to the new MDF room and replacing a water heater.
Plans (click to expand/collapse)