Kennedy High School Administration Relocation Project #1000004435
The Project consists of relocation of the administration and classroom functions of Buildings 100 and 200 to the existing portable buildings at the south side of the campus. The scope of work includes relocating the existing panels and equipment for the Fire Alarm System, Clock/Speaker System, Security Alarm System, and Telephone System from existing MDF Room to new MDF Room in Bldg. 300. All of these systems will need cabling connections restored or provided between the new MDF and the IDFs located in other buildings on the campus including the portable buildings. The scope of work also includes framing a new wall and door to the new MDF room and replacing a water heater.