Korematsu MS Building B Gymnasiums Flooring Recoating, Refinishing & Partial Floor Replacement, Proj
The Project consists of partial removal and replacement of existing wood floor coating and finishes at main Gym and Auxiliary Gym. Repair existing surfaces defects as needed to receive new coatings and finishes. New coating finishes and striping to match existing finishes and striping.
Addendum 1
(click to expand/collapse)
Name | Size | |||
Addendum No. 1 Korematsu MS Bldg#1000004214. | 2.1 MB |